National Oil Transmission Pipeline
Back to Projects Archive
Completed — 2021

National Oil Transmission Pipeline

Corrosion monitoring and DCVG/CIPS surveys over hundreds of kilometres of buried pipeline.

Client
NIOPDC
Site Location
South–Central corridor
Execution Year
2021
Departments Involved
Corrosion Monitoring Cathodic Protection
320 km buried line
The Challenge

Localized corrosion at river crossings and AC interference from co-located power lines. Legacy survey data was fragmented without integrated GIS mapping.

Payeshco Engineering Solution

High-resolution DCVG, continuous CIPS, and AC/DC interference analysis. Corrosion risk mapping with coating repair prioritization. Operator training for periodic monitoring.

Client Endorsement

Official Testimonial

"Payeshco's engineering report became the basis for our annual repair program. Field accuracy and NACE SP0502 compliance were outstanding."
Dr. A. Rezaei Inspection Technical Manager — NIOPDC