PayeshCo | Cathodic protection of crude oil pipelines — Band-e Karkheh oil field development 
Back to archive
Completed

Cathodic protection of crude oil pipelines — Band-e Karkheh oil field development

CP with 12 stations covering 280 km of 32- and 36-inch heavy oil lines and laterals.

Cathodic protection of crude oil pipelines — Band-e Karkheh oil field development
EPC
  1. Client Petroleum Engineering and Development Company
  2. Location Khuzestan — Ahvaz
  3. Year 2014–2014
  4. Scopes Cathodic Protection
Field gallery