Back to archive
Design, supply, installation and operation of equipment for Metro Line 6
Changing the cathodic protection system of Azarpad Pier from temporary to permanent and implementing a remote monitoring system
Design, supply of equipment, installation and commissioning of the cathodic protection system for Azarpad wharf along with a remote monitoring system
- Client Petroleum Export Terminals Company
- Location Bushehr– Kharg
- Year 2007–2010
- Scopes Cathodic Protection
Field gallery
Nearby files
Keep exploring
-
2004–2005
Cathodic protection of jetties 14 and 15 and breakwater structures at Pars Petrochemical Port
Pars National Petrochemical Industries Company
-
2015–2015
Cathodic protection of export wharf, gas pipeline and Kaveh methanol plant
Kaveh Methanol Company
-
2008–2009
Installing a densitometer and monitoring system on the headers of T and Azarpad piers
Petroleum Export Terminals Company
-
2023–2023
Temporary and permanent cathodic protection inside and outside crude oil storage tanks
Makran Petrorefining Company